Detect phase loss on a three-phase supply from L1, L2 and L3 voltages: count the phases below 10 % of nominal and name them. Catches phase failure, a missing phase or a blown fuse on switchboards, energy meters and the feeds of motors, pumps and compressors. A running motor can hide a lost phase, so pair it with a current imbalance alarm. Reports phases the meter cannot read (OFF, ERR) apart, so an alarm can tell them from a real loss.
Who it’s for
Electricians, maintenance engineers and facility managers asking “has a phase dropped out on this supply?”, “did a fuse blow on the motor or pump feed?”, “which phase is missing on this switchboard?” — when the meter reports three phase voltages and a lost phase is easy to miss until a machine trips or stops.
What it does
Reads the latest voltageL1, voltageL2 and voltageL3 telemetry (phase-to-neutral voltage, V) and two server-scope attributes, nominalVoltage and phaseLossThresholdPercent, and writes four keys:
The 10 % default follows IEEE 1159, which calls a voltage below 0.1 pu (10 % of nominal) an interruption. On a US 120 V system, set nominalVoltage to 120, so the limit becomes 12 V.
A voltage exactly at the limit is not lost: it must be below it. A setting that is not a number counts as 230 V and 10 %.
The field waits until all three voltages have arrived at least once. The result gets the time of the newest input, not the time the server computed it, so it lines up with the voltages on a chart.
Dashboards, alarm rules and other calculated fields can read the four keys like any other telemetry key. Because the counts are separate, an alarm can tell a lost phase from a phase the meter cannot read, and give them different severities.
How to customize
- To use this on your meter’s keys — change the Time series key on the
phaseL1,phaseL2andphaseL3arguments (e.g. voltageL1 → voltageA). - To set the nominal voltage or the threshold for one device — add a server attribute
nominalVoltageorphaseLossThresholdPercenton that device (e.g. 120 for a US 120 V supply). - To change the nominal voltage or the threshold used when no per-device attribute is set — change Default value on the
nominalorthresholdPercentargument. - To count an unreadable phase as lost — in the Script, replace
unknown.add(name);withlost.add(name);.unknownPhaseCountthen stays 0. - To rename the outputs — open the Script and replace the four keys in the return object with your own keys.
- To filter, transform, or forward the result to external systems — switch Strategy to Process via Rule Chains. Rule nodes then receive the result and can drop it, change it, save it conditionally, or push it to an external system.
See also
To raise an alarm as soon as a phase is lost, or when the meter cannot read a phase:
Three-Phase Phase Loss AlarmA running three-phase motor can keep the lost phase at almost full voltage by itself, so a voltage check can miss a phase lost on the motor side. The phase currents show it clearly: the current of the lost phase falls and the others rise. To raise an alarm on that current imbalance:
Motor Phase Current Imbalance AlarmShare Your Calculated Field with the Community
Built a useful data transformation? Export it as a JSON from ThingsBoard and publish it to the IoT Hub. Share it with thousands of ThingsBoard developers worldwide.